Energy

Image
Keystone

Bad River Band testifies on Line 5 reroute concerns

Enbridge applied for permits and proposed to reroute the line in 2020 by replacing 20 miles of existing pipeline – including the 12 miles currently within the reservation – with a 41-mile-long stretch of pipe around the reservation in northern Wisconsin.